PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct work at the 1st Floor Facing North (800x600).jpg Installed metal decking at Stair -4 Roof Facing North (800x600).jpg Sanitary Piping at the 1st Floor Facing East (800x600).jpg Started installing the sanitary piping at the 1st Floor Facing East (800x600).jpg Started laying out block at the Juvenille-Adult Cells Facing South-East (800x600).jpg Started pathching Stair -4 (4th Floor) (800x600).jpg Unloaded duct work at the 2nd Floor Facing East (800x600).jpg Welding clips at the 4th Floor East Elevation(800x600).jpg
Previous pageNext page Started laying out block at the Juvenille-Adult Cells Facing South-East (800x600)
Started laying out block at the Juvenille-Adult Cells Facing South-East (800x600)